Do You Have A Construction Project We Can Help With?

DAYS INN BY WYNDHAM

What is shown here, is a hotel room as it was before and after renovations. Alongside Our decorator, we changed the carpet to vinyl laminate flooring. Additionally, we put in a new, bigger baseboard and decorated the closet with special wood. Ceramic tile in was placed in the sink and we had changed the color of the corresponding mirror. In the bathroom, we changed the wallpaper to ceramic tile and we replaced the ceiling with waterproof drywall. For the room itself, we had changed the color of the picture frames along with the doors. In order to further illuminate the room, we utilized two different colors on the walls. Finally, we constructed wood-style wall décor with mirrors using wood stain and polyurethane.

Project Details

DATE

March 7, 2019

CLIENT

Wyndham

PROJECT TYPE
CONTRACTOR

ECB Contractions

Project Gallery

Get A Quote Today

Fill the required fields and get your quote today! We are here to fullfill your imagination.